Inquiry NowConstruction Of Integrated Sci in Kamrup - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Integrated Sci" in Kamrup, India.
- Opening Date : Fri 19th December, 2025
- Closing Date : Fri 19th December, 2025
- ₹ 7588000.00
- NTID 43139618
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
151760.00 -
Document Cost
1518.00 -
Estimated Cost
7588000.00
BOQ Items Total Items : 74 | Total Qty : 21789.271
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Civil Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil | 346.060 | cum |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 143.096 | cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.728 | cum |
| 4 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 10.512 | sqm |
| 5 | Diluting and injecting chemical emulsion for post constructional anti-termite treatment (excluding the cost of chemical emulsion): Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 189.104 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054