- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of BACKWARD CLASSES WELFARE DEPARTMENT
- >
NTID 44663179
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Hostel Buildin in Kuchinda - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Hostel Buildin" in Kuchinda, India.
- Opening Date : Tue 7th April, 2026
- Closing Date : Mon 6th April, 2026
- ₹ 3328820.00
- NTID 44663179
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
33300.00 -
Document Cost
7080.00 -
Estimated Cost
3328820.00
BOQ Items Total Items : 33 | Total Qty : 2657.27
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Ground Floor | ||
| 2 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. | 132.39 | 100 Cum |
| 3 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other . if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. | 86.62 | One Cum |
| 4 | CC (1:4:8) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and . of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. | 33.78 | One Cum |
| 5 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all . of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054