Inquiry NowConstruction Of High Level Bri in Kallkurichi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of High Level Bri" in Kallkurichi, India.
Highways Department
Kallkurichi, Tamil Nadu, India
NTID 43790255
- Opening Date : Tue 17th February, 2026
- Closing Date : Tue 17th February, 2026
- ₹ 69454000.00
- NTID 43790255
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
357500.00 -
Document Cost
Refer Documents -
Estimated Cost
69454000.00
BOQ Items Total Items : 85 | Total Qty : 17667.88
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation in all classes of soil, and depositing on bank,with all leads and lifts as per SS20B,including all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary, etc., complete as per relevant standard specification, for DRESSING THE BED. | 100.00 | Cubic Metre |
| 2 | Earthwork excavation in all classes of soil and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION UNDER ABUTMENTS, RETURN WALL AND PIERS as per section 300 of MORT&H Specifications (Fifth Revision) | 240.00 | Cubic Metre |
| 3 | Earth work excavation in rock not requiring blasting Boulders and depositing on bank, with all leads and lifts, including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS, RETURN WALL AND PIERS as per Section 300 of MORT&H Specifications (Fifth Revision) | 1010.00 | Cubic Metre |
| 4 | Earth work excavation in rock not requiring blasting (SDR and Soft rock) and depositing on bank, with all leads and lifts, including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS, RETURN WALL AND PIERS as per Section 300 of MORT&H Specifications (Fifth Revision) | 1580.00 | Cubic Metre |
| 5 | Compacted Cement concrete M15 (Nominal mix) 1:2:4 using 40 mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying, compacting, curing concrete, hire charges for tools and plants including all other incidental charges, such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for FILLING THE TRENCHES AROUND THE FOOTINGS UPTO THE TOP OF ROCK as per C1.707.4.6 of IRC 78:2014 | 220.00 | Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054