- Home
- >
- Tender
- >
- Jammu and Kashmir Tender
- >
- Department of Rural Development and Panchayati Raj
- >
NTID 43235500
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Gobardhan Proj in Bandipora - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Gobardhan Proj" in Bandipora, India.
Rural Development and Panchayati Raj
Bandipora, Jammu and Kashmir, India
NTID 43235500
- Opening Date : Sat 27th December, 2025
- Closing Date : Fri 26th December, 2025
- ₹ 3057000.00
- NTID 43235500
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
61140.00 -
Document Cost
2200.00 -
Estimated Cost
3057000.00
BOQ Items Total Items : 37 | Total Qty : 10904.75264224
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1114.83648 | sqm |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 2.27.3 Beyond 120 cm girth upto and including 240 cm girth. | 5 | no. |
| 3 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 2.27.2 Beyond 60 cm girth upto and including 120 cm girth. | 30.00 | no. |
| 4 | Excavating holes more than 0.10 cum and upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil; as directed within a lead of 50 m and lift upto 1.5 m in:2.13.1 All kinds of soil. By manual | 90.00 | no. |
| 5 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.1 All kinds of soil : | 430.06 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054