- Home
- >
- Tender
- >
- Arunachal Pradesh Tender
- >
- Department of Public Works Department
- >
NTID 44683984
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of General Ground in Longding - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of General Ground" in Longding, India.
Public Works Department
Longding, Arunachal Pradesh, India
NTID 44683984
- Opening Date : Mon 6th April, 2026
- Closing Date : Mon 6th April, 2026
- ₹ 0.00
- NTID 44683984
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
207920.00 -
Document Cost
3000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 5 | Total Qty : 58733.16
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SH:I-Jungle Clearance : 1 Job | ||
| 2 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By Mechanical Means In area of thorny jungle | 8.00 | Hect |
| 3 | SH:II-Earthwork :- 1 Job | ||
| 4 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 14681.29 | Cum |
| 5 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto adistance of 100 metres (average lead 50 metres), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 44043.87 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054