- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Gorakhpur Industrial Development Authority
- >
NTID 46558941
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Gate On The En in Gorakhpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Gate On The En" in Gorakhpur, India.
Gorakhpur Industrial Development Authority
Gorakhpur, Uttar Pradesh, India
NTID 46558941
- Opening Date : Tue 22nd September, 2026
- Closing Date : Tue 22nd September, 2026
- ₹ 5265955.00
- NTID 46558941
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
464000.00 -
Document Cost
2950.00 -
Estimated Cost
5265955.00
BOQ Items Total Items : 27 | Total Qty : 2917.53
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251 | 76.57 | Cum |
| 2 | Sand filling in plinth including supply of necessary quantity of local sand from a distance not exceeding 8 Kms from the site of work and including watering dressing etc. required for proper completion of work. | 6.18 | Cum |
| 3 | Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. | 14.45 | Cum |
| 4 | Provding and laying Cement concrete wearing Coarse M-30 Grade including Reinforcement as per Drawing and technical Specifcation Morth Clauses 13.05G | 52.82 | Cum |
| 5 | Mild steel or iron work in plain work such as reinforced cement concrete (when not included in over all rate) wrought to required shape as necessary including bending for proper completion of work, supply of steel, all labour etc. required and including wastage bend, hooks and authorised over lapping shall be measured. and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all otehr materials, labour and T&P etc. required for proper completion of the work. | 145.13 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054