- Home
- >
- Tender
- >
- Andaman and Nicobar Islands Tender
- >
- Department of Public Works Department
- >
NTID 44578810
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Gabion Wall In in MAYABUNDER - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Gabion Wall In" in MAYABUNDER, India.
Public Works Department
NTID 44578810
- Opening Date : Wed 8th April, 2026
- Closing Date : Wed 8th April, 2026
- ₹ 8300789.00
- NTID 44578810
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
166016.00 -
Document Cost
Refer Documents -
Estimated Cost
8300789.00
BOQ Items Total Items : 14 | Total Qty : 4553.35
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | ||
| 2 | All kinds of soil | 551.00 | cum |
| 3 | Extra rates (%) for quantities of works, executed: Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these dificult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in dificult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored. | ||
| 4 | In or under water and/or liquid mud, including pumping out water as required | 551.00 | metre depth |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 1007.00 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054