- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of HIMACHAL PRADESH AGRICULTURE DEVELOPMENT SOCIETY
- >
NTID 47251076
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Flow Irrigatio in Sarkaghat - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Flow Irrigatio" in Sarkaghat, India.
HIMACHAL PRADESH AGRICULTURE DEVELOPMENT SOCIETY
Sarkaghat, Himachal Pradesh, India
NTID 47251076
- Opening Date : Fri 6th November, 2026
- Closing Date : Thu 5th November, 2026
- ₹ 266388.00
- NTID 47251076
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 32 | Total Qty : 510.07
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Demolishing of cement concrete manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 1.8 | Cum. |
| 2 | Excavation work by mechanical means ( Hydraulic excavator) manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm. On plan), including, dressing of sides and ramming of bottoms, lift upto 1.5 mtr. , including getting out the excavated soil and disposal of surplus excavated soils as directed , within a lead of50 mtr. within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 18.61 | Cum. |
| 3 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all lead and lifts including restoration of unmettalled surfaces to its original condition complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 50 | Rmt |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : | ||
| 5 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 3.16 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054