- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 43218696
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Entrance Gate in Boudh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Entrance Gate " in Boudh, India.
- Opening Date : Wed 24th December, 2025
- Closing Date : Tue 23rd December, 2025
- ₹ 5581564.00
- NTID 43218696
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
55900.00 -
Document Cost
10000.00 -
Estimated Cost
5581564.00
BOQ Items Total Items : 118 | Total Qty : 8446.223
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK ENTRANCE GATE WITH SECURITY POST Dismantling brick work, stone masonry in Cement mortar under 3meter height including stacking the useful material for reuse and removing the debris within 50 meter lead etc complete as per the direction of the Engineer in Charge. | 2.570 | sqm |
| 2 | Dismantaling & Removing RCC column, beam, slab, staircase, landing, lintel band including stacking of the same with all labour T&P etc complete, with the cost conveyance royalties taxes of the materials and labour with T&P required for the work etc. | 3.470 | cum |
| 3 | Dismantling and removing doors, windows and ventilaters after carefully removing the bolts and nuts including stacking of the materials for reuse and removing the debris within 50 meter lead. | 21.330 | sqm |
| 4 | Earth work in excavation in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer in Charge. | 97.400 | cum |
| 5 | Filling foundation and plinth with excavated materials well watered & rammed etc. including cost, conveyance of all material, labour and T&P require for the work etc. complete as directed by E.I.C | 64.933 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054