- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Irrigation Department
- >
NTID 45202299
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Drb At Km 2 50 in Amroha - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Drb At Km 2 50" in Amroha, India.
Irrigation Department
Amroha, Uttar Pradesh, India
NTID 45202299
- Opening Date : Sat 23rd May, 2026
- Closing Date : Fri 22nd May, 2026
- ₹ 1526072.00
- NTID 45202299
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
31000.00 -
Document Cost
604.00 -
Estimated Cost
1526072.00
BOQ Items Total Items : 20 | Total Qty : 1686.61
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the size of foundation | 114.000 | cum |
| 2 | Laying Cement concrite in M-15 1:2:4 in cement coarse sand and stone grit mix. including all costs of T&P material required for proper complition of work. | 60.600 | cum |
| 3 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | 44.200 | cum |
| 4 | Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work in all conditions. | 15.300 | cum |
| 5 | Laying Cement concrite in M-10 1:3:6 in cement coarse sand and stone grit mix. including all costs of T&P material required for proper complition of work. | 31.500 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054