- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 47232123
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of District Court in Boudh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of District Court" in Boudh, India.
- Opening Date : Wed 11th November, 2026
- Closing Date : Tue 10th November, 2026
- ₹ 62593841.00
- NTID 47232123
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
626000.00 -
Document Cost
10000.00 -
Estimated Cost
62593841.00
BOQ Items Total Items : 318 | Total Qty : 56029.472
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Civil Works Dismantling brick or stone masonry in lime or cement mortar above 12mt.height including stacking the useful materials for reuse and removing the debris within 50m. Lead including all cost, conveyances of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge Third Floor | 111.45 | cum |
| 2 | Dismentaling & removing R.C.C columns beams, slab, staircase, landing, lintels, including stacking the useful materials for the reuse and removing the debries within 50 mincluding all cost, conveyances of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge Third Floor | 56.41 | cum |
| 3 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead including all cost i.e cost of all matericals,all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. Third Floor | 46.02 | cum |
| 4 | Dismantling GCI and AC sheet roofing after carefully removing the bolts and nuts including stacking the useful materials for reuse and removing the debris within 50m lead including all cost i.e cost of all matericals,all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. Third Floor | 163.41 | sqm |
| 5 | Dismantling and removing Doors, Windows and ventilators after carefully removing the bolts and nuts including stacking the useful materials for reuse and removing the debris within 50m lead including all cost i.e cost of all matericals,all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. Third Floor | 27.31 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054