- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of Uttarakhand Pey Jal Nigam
- >
NTID 43226005
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Directorate Bu in Dehradune - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Directorate Bu" in Dehradune, India.
Uttarakhand Pey Jal Nigam
Dehradune, Uttarakhand, India
NTID 43226005
- Opening Date : Mon 5th January, 2026
- Closing Date : Sat 3rd January, 2026
- ₹ 19919000.00
- NTID 43226005
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
398000.00 -
Document Cost
5900.00 -
Estimated Cost
19919000.00
BOQ Items Total Items : 156 | Total Qty : 67877.11
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | DSR Item- 5.33.2 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana I Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All works above plinth level upto floor V level, Concrete of M25 grade with minimum cement content of 330 kg /cum | 135.66 | Cum |
| 2 | DSR Item- 5.22.6 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 14500.00 | Kg |
| 3 | DSR Item- 5.9 Centring and shuttering including strutting,ropping etc. and removal of form for | ||
| 4 | DSR Item- 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 2.94 | Sqm |
| 5 | DSR Item- 5.9.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 38.81 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054