- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of University of Pune
- >
NTID 44602273
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Compound Wall in Pune - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Compound Wall " in Pune, India.
University of Pune
Pune, Maharashtra, India
NTID 44602273
- Opening Date : Mon 13th April, 2026
- Closing Date : Sat 11th April, 2026
- ₹ 1552119.00
- NTID 44602273
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
16000.00 -
Document Cost
1500.00 -
Estimated Cost
1552119.00
BOQ Items Total Items : 22 | Total Qty : 884.74
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling stone masonry in lime or cement including stacking the materials as directed with all leads, lifts, complete. Spec. No.: As directed by Engineer in charge. | 0.45 | Cu.m. |
| 2 | Dismantling brick masonry in lime or cement mortar and stacking the materials as directed with all leads, lifts complete. Spec. No: - As directed by Engineer in charge | 0.25 | Cu.m. |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Spec. No.: Bd. A.1 Page No. 259 | 32.00 | Cu.m. |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) Spec No.Bd.A.2 Page One Number 259, By Mechanical Means | 33.00 | Cu.m. |
| 5 | Excavation for foundation in Soft rock and old cement and lime masonry foundations including removing the excavated mate-rials upto a distance of 50 metres beyond the building area and stacking as directed including dewatering preparing the bed for the foundation and necessary back filling with available earth murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means Spec. No.: Bd.A.4 Page No. 259 | 5.80 | Cu.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054