- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Greater Noida Industrial Development Authority
- >
NTID 45165084
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Class Room Ve in Gautam Budnagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Class Room Ve" in Gautam Budnagar, India.
Greater Noida Industrial Development Authority
Gautam Budnagar, Uttar Pradesh, India
NTID 45165084
- Opening Date : Mon 25th May, 2026
- Closing Date : Thu 21st May, 2026
- ₹ 14329028.00
- NTID 45165084
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
287000.00 -
Document Cost
2620.00 -
Estimated Cost
14329028.00
BOQ Items Total Items : 195 | Total Qty : 63933.98
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Part-A Khanpur Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) | 301.5100 | Cum |
| 2 | Sand filling in plinth including supply of necessary quantitiy of sand from a distance not exceeding 8Kms from the site of work and including watering, dressing etc. labour and T & P etc. required for the proper complition of the work. Saplings of girth upto 30cm. measured at a height of 1 M above ground level and removal of rubbish upto a distance of 50m out side the periphery of area cleared. (SOR-20/255) | 64.6800 | Cum |
| 3 | Cement concrete with 4cm gauge Approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work | ||
| 4 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) | 19.7900 | Cum |
| 5 | 2 cm thick Damp proof Course with Cement and approved coarse sand 1:2 with and including water proofing as ordered by the Engineer in-charge in the proportion as by the manufacture including supply of all materials, labour, Tools & plants etc. required for proper completion of the work and including proper curing & Shutterings as necessary. (SOR-20/7.01/360) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054