- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Directorate of Local Bodies UP
- >
NTID 47146937
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Civil Work 05 in Chitrakoot - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Civil Work 05 " in Chitrakoot, India.
Directorate of Local Bodies UP
Chitrakoot, Uttar Pradesh, India
NTID 47146937
- Opening Date : Tue 3rd November, 2026
- Closing Date : Tue 3rd November, 2026
- ₹ 3847000.00
- NTID 47146937
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
76940.00 -
Document Cost
4600.00 -
Estimated Cost
3847000.00
BOQ Items Total Items : 51 | Total Qty : 9092.95
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Surface Dressing of ground Including removing vegetation and ln-equalilles not exceeding 15 cm deep and disposal of rubbish, lead up 10 50 m and lilt upto1.5 m. All kinds of soil. | 700.07 | sqm |
| 2 | Earth work In surlace excavation not exceeding 30 cm In depth but exceeding 1.5m In width as well as 10 sqm on plan Including getting out and disposal of excavalad earth upto 50 m and 11ft upto 1.5 m, as directed by Engineer-In-Charge 2.1.1, All kinds of soil. | 120.45 | cum |
| 3 | Excavating, supplying and filling of local earth (Including royalty) by mechanical transport upto a load of SKM also Including ramming and watering of the earth In layers not exceeding 20cm In trenches, pllnth, sides of foundation etc. comnlete | 290.23 | cum |
| 4 | Providing & Laying of C.C. in 1:4:8 with els and 40 mm G.S.B. In foundallon of Floor I/e all labour materials and T& P etc. | 71.35 | cum |
| 5 | R.C.C. Road works cement appoved coatsesand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 in Foundation excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I.Icludind 25 Mycron Polythin & shuttening etc. and also including supply of all materials, labour and tools and plants etc. requred for proper completion of the work binding wire to be supplied by the contractor free of cost. | 47.22 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054