- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Siliguri Jalpaiguri Development Authority
- >
NTID 43957437
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cc Drain From in Jalpaiguri - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cc Drain From " in Jalpaiguri, India.
Siliguri Jalpaiguri Development Authority
Jalpaiguri, West Bengal, India
NTID 43957437
- Opening Date : Fri 27th February, 2026
- Closing Date : Tue 24th February, 2026
- ₹ 1710405.00
- NTID 43957437
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
34208.00 -
Document Cost
Refer Documents -
Estimated Cost
1710405.00
BOQ Items Total Items : 12 | Total Qty : 3589.15
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 344.25 | M3 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 114.75 | M3 |
| 3 | Laying 150mm (approximate finished thickness) boulder soling including rough dreesing, breaking necessary hand packing and ramming down small stome pieces in the intersectices including rolling and repairing the bed of proper level camber with necessary cushionine over bed and ultimate filling of voids with moorum or sand or kiln rubbish including cost of all materials but excluding cost of boulders | 426.00 | M2 |
| 4 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety a)1:3:6 proportion | 170.40 | M3 |
| 5 | Ordinary Cement concrete(mix 1:1.5:3) M-20 with graded stone chips (20 mm down ) excluding shuttering and reinforcemnet,if any . In ground floor as per IS 456-2000. Pakur Variety | 26.44 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054