- Home
- >
- Tender
- >
- Rajasthan Tender
- >
- Department of AJMER DEVELOPMENT AUTHORITY
- >
NTID 43032006
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cc And Bt Road in Ajmer - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cc And Bt Road" in Ajmer, India.
- Opening Date : Wed 24th December, 2025
- Closing Date : Tue 23rd December, 2025
- ₹ 47800000.00
- NTID 43032006
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
956000.00 -
Document Cost
5000.00 -
Estimated Cost
47800000.00
BOQ Items Total Items : 27 | Total Qty : 85923.35
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201 By Mechanical Means In area of light jungle | 1.2 | Hect |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, scaking serviceable and unserviceable materials separately as per MoRTH specification claue : 202 By Mechanical Means Bituminous courses | 2800.0 | Cum |
| 3 | Dismantling upto 1.5m in foundation and/or 1.5m above ground level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material, and stacking serviceable material within a lead of 1000m. [MoRTH Specification clause 202] Cement Concrete plain 1:3:6 mix. | 1260.0 | Cum |
| 4 | Haulage excluding Loading & Unloading Haulage of materials by tipper excluding cost of loading, unloading and stacking. Case-I : Surfaced Road Item 2 & 3 Lead upto 5 K.M. | 4060.0 | tonn |
| 5 | Earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305). In ordInary soil mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper | 2100.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054