- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
- >
NTID 44638400
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cable Trench in Midnapore - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cable Trench " in Midnapore, India.
WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
Midnapore, West Bengal, India
NTID 44638400
- Opening Date : Fri 10th April, 2026
- Closing Date : Mon 6th April, 2026
- ₹ 0.00
- NTID 44638400
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
96705.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 23 | Total Qty : 5397
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. . Upto 150 mm thick. a) In ground floor | 10 | Cum |
| 2 | Dismantling all types of masonry excepting plain cement concrete of reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. a) In ground floor | 5 | Cum |
| 3 | Dismantling R.C. floor, beams etc including cutting rods and removing rubbish as directed within a lead of 75m including stacking steel bars. a) In ground floor | 2 | Cum |
| 4 | Earth work in excavation of foundation trenches or drains in all sorts of soil but excluding laterite or sandstone including removing spreading or stacking the spoils within a lead of 75m. as directed. The item includes leveling, dressing and ramming the bottom bailing out water as required complete.i) Depth of excavation not exceeding, 1.50 metre. | 450 | Cum |
| 5 | Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. i) With earth obtained from excavation of foundation. | 150 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054