Inquiry NowConstruction Of Bus Shelter At in Madambakkam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Bus Shelter At" in Madambakkam, India.
MUNICIPAL CORPORATION
Madambakkam, Tamil Nadu, India
NTID 46091688
- Opening Date : Fri 21st August, 2026
- Closing Date : Fri 21st August, 2026
- ₹ 2000000.00
- NTID 46091688
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20000.00 -
Document Cost
Refer Documents -
Estimated Cost
2000000.00
BOQ Items Total Items : 11 | Total Qty : 7948
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 48 | m3 |
| 2 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 13 | m3 |
| 3 | Centering and shuttering for RCC & PCC Works including cost and conveyance of materials and labour charges etc complete. | 95 | m2 |
| 4 | Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 3000 | Kgs |
| 5 | Reinforced Cement Concrete 1:1.5:3 (One cement one and half fine aggregate and three course aggregate) mix using 20mm HBG ISS metal for all RCC items of works excluding centering and shuttering and cost of reinforcement grill but including curing the same and also fixing fan clamps and fixtures in RCC works whereever necessary as directed by the departmental officer etc., complete | 19 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054