- Home
- >
- Tender
- >
- Chhattisgarh Tender
- >
- Department of Indo Tibetan Border Police Force
- >
NTID 44680681
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction of Boundary Wall in Raipur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction of Boundary Wall " in Raipur, India.
Indo Tibetan Border Police Force
Raipur, Chhattisgarh, India
NTID 44680681
- Opening Date : Sat 18th April, 2026
- Closing Date : Fri 17th April, 2026
- ₹ 49623112.00
- NTID 44680681
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
992462.00 -
Document Cost
Refer Documents -
Estimated Cost
49623112.00
BOQ Items Total Items : 76 | Total Qty : 155304.31
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting ofrank vegitation, grass, brush wood, trees and saplings of girth upto 30 cm meassurred at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 4650.00 | Sqm |
| 2 | Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dresing of sides and ramming of bottoms lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed , within a lead of 50 m. All kind of soil | 1841.02 | Cum |
| 3 | Filling available excavated earth (excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completed lead up to 50 m and lift up to 1.5 m, | 842.34 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 300.26 | Cum |
| 5 | Centering and shutturing inclusive strutting, proping etc and removal of form work for all heights Foundations, footings, bases of columns, etc. for mass concrete | 2163.22 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054