Inquiry Now2 Construction Of Boundary Wa in Muzaffarnagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "2 Construction Of Boundary Wa" in Muzaffarnagar, India.
Cane Development and Sugar Industry UP
Muzaffarnagar, Uttar Pradesh, India
NTID 47250476
- Opening Date : Thu 12th November, 2026
- Closing Date : Thu 12th November, 2026
- ₹ 1552000.00
- NTID 47250476
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
155000.00 -
Document Cost
1045.00 -
Estimated Cost
1552000.00
BOQ Items Total Items : 18 | Total Qty : 11321.162
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 74.06 | CUM |
| 2 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. | 10.379 | CUM |
| 3 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3(1 cement : 1.5 coarse sand : 3 stone aggregates) in lighter beams i.e. having spans upto 6 m. excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than (M-20) | 12.083 | CUM |
| 4 | R.C.C.workin R.C.C.raft foundation and footing with approved stone ballast ( using 1:1.5:3 mix concrete ) | 13.738 | CUM |
| 5 | R.C.C.workin R.C.C.column with approved stone ballast ( using 1:1.5:3 mix concrete ) | 5.643 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054