- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Department of Rural Development
- >
NTID 46095943
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Boundary Wall in Bhadrak - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Boundary Wall " in Bhadrak, India.
- Opening Date : Mon 10th August, 2026
- Closing Date : Fri 7th August, 2026
- ₹ 1270897.00
- NTID 46095943
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
12709.00 -
Document Cost
6000.00 -
Estimated Cost
1270897.00
BOQ Items Total Items : 17 | Total Qty : 2890.57
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in foundation and trenches hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of Engineer-in-charge. | 77.38 | Cum |
| 2 | Filling with sand well watered and compacted with appropriate rammer or mechanical compactor and top surface dressed and levelled to proper gradient as per direction of the Engineer-in-charge including watering and ramming with cost conveyance, royalities, taxes of all materials and labour with required for the work etc. complete as per specification and direction of the Engineer-In-charge. | 12.28 | Cum |
| 3 | Providing cement concrete 1:3:6 with 40 mm nominal size of hand crusher broken hand granite stone aggregate of approved quality from approved quarry in foundation up to a depth of 1.5m.below ground level and up to a height of 1.5m above Ground level or Bed level including hoisting, lowering and laying in position in layers not exceeding 150 mm thick with proper packing and ramming to proper slope and level including curing dewatering, shoring, shuttering if necessary at the time of laying concrete with cost,conveyance, royalty,taxes of all materials required for the work, including supplying and working of pumps and all other materials required for the work, TandP articles, including all labour finishing the exposed surface, smooth, providfing grooves and beads where ever necessary etc. complete as per spoecification for Road and Bridge works and direction of Engineer-in-charge. | 10.03 | Cum |
| 4 | RCC work of M-20 grade Foundation having a minimum compreshive srength 150kg per cm2 in 150mm cubes at 28 days curing after mixing and test conducted in accordance with I.S 456 and I.S 516 using black hard crusher broken granaite chipsof 20mm and down-grade size not exceeding 25percent of approved quality including hoisting and laying placing in position concrete watering and curing for 28 days including cost of rigid and smooth stool centering and shuttering with C.M plaster 1:2 at no extra cost where necessery and cost, conveyance, royality and taxes of all materials labour required for the work etc. complete but excluding cost of M.S. Rod or Tor steel and binding and tying the grills and placing in position etc.complete. The materials used in the work and finished item of work shall confirm to relevant I.S specification and as per specification and direction of the Engineer-In-charge. The testing charges will be borne by the contractor | 11.19 | Cum |
| 5 | Plinth beam | 4.7 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054