- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Directorate of Urban Development
- >
NTID 46106047
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Bench By Provi in Chamba - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Bench By Provi" in Chamba, India.
Directorate of Urban Development
Chamba, Himachal Pradesh, India
NTID 46106047
- Opening Date : Tue 11th August, 2026
- Closing Date : Tue 11th August, 2026
- ₹ 782339.00
- NTID 46106047
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 4 | Total Qty : 291.65
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 68.31 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 138.06 | Cum |
| 3 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications | 35 | each |
| 4 | Backfilling behind abutment, wing wall and return wall with granular material complete as per the Drawings and Specifications. 710.1.4 of IRC :78 and 2200 Item to include all materials, labour, machinery/equipment and incidental work including mechanical transport required to complete the job including all leads and lifts. Measurement shall be made for compacted finished volume of the backfilling material, and as per direction of Engineer-in-Charge. | 50.28 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054