Inquiry NowConstruction Of Artificial Rec in Muzaffarpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Artificial Rec" in Muzaffarpur, India.
WAPCOS LIMITED
Muzaffarpur, Bihar, India
NTID 46598903
- Opening Date : Thu 17th September, 2026
- Closing Date : Wed 16th September, 2026
- ₹ 160792589.00
- NTID 46598903
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
3215852.00 -
Document Cost
5900.00 -
Estimated Cost
160792589.00
BOQ Items Total Items : 22 | Total Qty : 30407.672229
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Jungle clearance in barrow area building premises flanks slope of exixting road and canal etc., embankment by removing the jungle, bushes from top including weeding out shrubs including roots and leveling complete job as per spectifications and direction of E/I | 9000 | Sqm |
| 2 | Earth work by Mechanical means with help of excavator tipper and spreader in canal or flood embankment or dhar all types of work filling making canal banks or embankment of earth fress from logs roots or any other gradients desilting of canal bed adher in proper profile with dressing and finishing including new construction repair or restoration in ordinary soil including cutting loading carriage for pit to banks embankment unloading spreading clod breaking and laying in layers properly with leads of lead will be considereed as path ie half distance travelled in one cycle i.e half of hualage path from pit to bank or embackment pit will be beyond 150 M from center i.e perpendicular distance from center of bank boundry of pit will be more than 150M and wiith all lifts all complete job as per specifications and direction of E/I (mode of measurement-sectional measurement of compacted earth) | ||
| 3 | Beyond 150 M but up to 1/2 KMs | 1700 | Cum |
| 4 | Beyond 1/2 KM but up to 1 KMs | 1700 | Cum |
| 5 | Compaction of earth, rolling and compacting earth in layers of 225 mm thick at OMC by sheep foor roller to achievve minimum 95%of dry density including sprinkilng the required of water making arrangement for supply and carriage of water with all leads and lifts finishing the surfaces as per plan and drawing including hire charges of compaction machine and other tools and plants ETC., all complete as per specifications and direction of E/I (mode of measurement of compacted earth ) | 3400 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054