Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Approach Road " in Kendujhar, India.
- Opening Date : Sat 20th December, 2025
- Closing Date : Fri 19th December, 2025
- ₹ 6006304.00
- NTID 43063284
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
60100.00 -
Document Cost
10000.00 -
Estimated Cost
6006304.00
BOQ Items Total Items : 5 | Total Qty : 1922.86
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil with all leads & lifts with shoring and shuttering with working pump if required etc. complete as per the direction of the Engineer-in-charge. | 412.380 | Cum. |
| 2 | Filling Foundation and Plinth with soling stone of 150mm size and voids are filled up by excavated earth well watered including cost of sand , all labour charges etc. complete as per the direction of the Engineerin-charge | 298.620 | Cum. |
| 3 | Cement concrete 1:3:6 with 40 mm.size hard granite crusher broken chips for C.C. works including hoisting, lowering, laying and compacting concrete including cost, of all materials labour charges conveyance, royalities of all materials & cost of all T&P required for the work etc. complete and as directed by the Engineer-in-charge. | 469.260 | Cum. |
| 4 | Cement concrete (M-25) with 20 mm.size and down graded hard granite crusher broken chips for C.C. works including hoisting, lowering, laying and compacting concrete using vibrator, watering , and curing for 28days including cost, of all materials, labour charges conveyance, royalities of all materials & cost of all T&P required for the work etc. complete in all respect and as directed by the Engineer-in-charge. . | 237.000 | Cum. |
| 5 | Rigid & smooth centrering & shuttering for R.C.C. works including false work & dismentaling, cleaning the same after casting and after the minimum allowable time lapses as per I.S.S. including cost & carriage of all materials to the site of work etc.complete as per the direction of the Engineer in charge.( a ) Foundation and Plinth | 505.600 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054