Inquiry NowConstruction Of Approach Road in Multi city - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Approach Road " in Multi city, India.
Deendayal Port Trust
Multi city, Gujarat, India
NTID 45152441
- Opening Date : Refer Documents
- Closing Date : Tue 9th June, 2026
- ₹ 785436249.00
- NTID 45152441
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
15708725.00 -
Document Cost
5900.00 -
Estimated Cost
785436249.00
BOQ Items Total Items : 13 | Total Qty : 3582596
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 22715.000 | M3 |
| 2 | Providing primary rock of 0.1 to 0.5T for road work/ground including cost of quarrying, royalty, loading, unloading, transportation and spreading in layers from existing ground to required level, levelling, dressing side slopes etc., complete with all labour and materials complete including settlement etc., as directed by the engineer in charge.Level | 368000.000 | MT |
| 3 | Supplying and stacking ofQuarry Spall /Ganular Material for Embankment of Approach Roads/Plot with incuding cost of excavation, royalty, loading, unloading transportation complete with all labour and materials or as directed by Engineer in charge | 521600.000 | MT |
| 4 | Laying, spreading, compacting and shifting of Quarry Spalls material with loading, unloading and transporting. The material shall be spread in uniform thickness and compacted in layers using vibratory rollers of 8-10 capacity with watering to achivce proper grade and camber. The work shall include consolidation to meet specified compaction values and surface accuracy, complete in all respects as directed by the EIC | 326000.000 | M3 |
| 5 | Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete1200 dia Pipe | 480.000 | RMT. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054