Inquiry NowConstruction Of 64 Rooms And 4 in Coimbatore - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 64 Rooms And 4" in Coimbatore, India.
Tamil Nadu Agricultural University
Coimbatore, Tamil Nadu, India
NTID 43203551
- Opening Date : Wed 31st December, 2025
- Closing Date : Tue 30th December, 2025
- ₹ 43407281.00
- NTID 43203551
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
266200.00 -
Document Cost
Refer Documents -
Estimated Cost
43407281.00
BOQ Items Total Items : 79 | Total Qty : 128848
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supplying and filling of GRAVEL in layers of not more than 15cm thick, well watered, rammed and consolidated etc., complete complying with standard specification and as directed by the departmental officers | 396.00 | m3 |
| 2 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m and maximum water cement ratio of 0.55, including admixture (Plasticizer / super Plasticizer) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the department for the excess usage of materials). | ||
| 3 | For superstructure in first floor | 336.00 | m3 |
| 4 | For superstructure in second floor | 288.00 | m3 |
| 5 | For superstructure in third floor | 15.00 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054