- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of Gujarat Mineral Development Corporation Limited
- >
NTID 46631867
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 2 Nos Vehicle in Ahmedabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 2 Nos Vehicle" in Ahmedabad, India.
- Opening Date : Refer Documents
- Closing Date : Mon 28th September, 2026
- ₹ 919100.00
- NTID 46631867
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 11 | Total Qty : 2397.03
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for foundation up to 1.50 m depth, including sorting out and stacking of useful materials and disposal of excavated earth/materials with all leads, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. (C) Hard Murrum. | 9.410 | cmt |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 hand-broken stone aggregates of 40 mm nominal size) and curing complete, excluding the cost of formwork, in (A) Foundations and Plinth, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 11.600 | cmt |
| 3 | Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregates of 20 mm nominal size) and curing complete, excluding the cost of formwork and reinforcement, for reinforced concrete work in (A) Foundations, Footings, Bases of Columns and Mass Concrete, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 8.250 | cmt |
| 4 | Providing formwork of ordinary timber planking to give a rough finish, including centering, shuttering, strutting, propping, etc., with height of propping and centering below the supporting floor/ceiling not exceeding 4.00 m, and removal of the same after completion, for in-situ reinforced concrete and plain concrete work in (A) Foundations, Footings, Bases of Columns and Mass Concrete, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 30.990 | Smt |
| 5 | Providing Mild Steel reinforcement for RCC work, including cutting, bending, binding and placing in position, complete up to two-floor level, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 423.930 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054