- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Environment Climate Change Department
- >
NTID 43218762
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 2 Nos Of Multi in Mayurbhanj - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 2 Nos Of Multi" in Mayurbhanj, India.
Environment Climate Change Department
Mayurbhanj, Odisha, India
NTID 43218762
- Opening Date : Sat 27th December, 2025
- Closing Date : Fri 26th December, 2025
- ₹ 27273614.00
- NTID 43218762
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
272736.00 -
Document Cost
10000.00 -
Estimated Cost
27273614.00
BOQ Items Total Items : 95 | Total Qty : 29322.16
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation in foundation in hard or gravelly soil within 50m initial lead and 1.50m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department. | 412.50 | cum |
| 2 | Filling in Foundation and Plinth with sand well watered and rammed including cost, conveyance and royalty charges. | 357.74 | cum |
| 3 | Cement concrete(1:3:6) using 40mm size CB metal including centering and shuttering, labour and cost, conveyance and royality of materials etc. complete. | 86.62 | cum |
| 4 | RCC work in M20 grade concrete (1:1.5 :3) with 20mm down grade CBHG chips including cost of centering and shuttering charges, labour and cost, conveyance and royalty of materials etc. complete but excluding cost and labour charges of MS reinforcement in column base | 142.35 | cum |
| 5 | RCC work in M20 grade concrete (1:1.5 :3) with 20mm down grade CBHG chips including cost of centering and shuttering charges, labour and cost, conveyance and royalty of materials etc. complete but excluding cost and labour charges of MS reinforcement in column and beams | 150.84 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054