- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 47241334
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 4 Nos D Type O in Bhawanipatna - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 4 Nos D Type O" in Bhawanipatna, India.
GOVERNMENT OF ORISSA
Bhawanipatna, Odisha, India
NTID 47241334
- Opening Date : Thu 12th November, 2026
- Closing Date : Wed 11th November, 2026
- ₹ 12585697.00
- NTID 47241334
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
126000.00 -
Document Cost
10000.00 -
Estimated Cost
12585697.00
BOQ Items Total Items : 215 | Total Qty : 16969.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in all types of soil for site leveling, Drain and other civil works upto 1.5 metre and stacking the soil including dewatering, removing slush,shoring and strutting (as required), complete as per specification and as per the directed of the Engineer-In-Charge. | 233.76 | Cum |
| 2 | Providing and laying plain cement concrete 1:3:6 (1 cement: 3 sand: 6 stone agregate 40mm nominal size) as levelling course in Drain etc. including tempering, curring ,shuttering etc.complete all depth and height as per the direction of Engineer in charge. | 18.3 | Cum |
| 3 | R.C.C. work of M 20 in following works using 12mm to 20 mm (1/2" to 3/4") size (20mm. Not exceed 25%) hard black. Crusher broken granite stone chips of approved qulitiy from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surface smooth with cost conveyance,royalty , taxes of all materials with all labour, labour cess and T & P required for the work. etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and Binding wire of 18 to 20 gauge and labour charges for straightening , cutting beinding, binding and tying the grills and placing in proper position and as per the direction of the Engineer in Charge. (a ) Column Footing | 28.2 | Cum |
| 4 | (c) Tie Beam | 11.2 | Cum |
| 5 | (d) Column +(i) Column (GF) +(ii) Floor Beam (GF) | 31.65 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054