- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 47230684
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 1 No Garrage in phulbani - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 1 No Garrage " in phulbani, India.
- Opening Date : Wed 11th November, 2026
- Closing Date : Tue 10th November, 2026
- ₹ 1078634.00
- NTID 47230684
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10800.00 -
Document Cost
6000.00 -
Estimated Cost
1078634.00
BOQ Items Total Items : 22 | Total Qty : 1710.48
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation in hard or gravelly soil including hard moorum, with all leads and lifts including dressing and leveling the bed and depositing the excavated earth at place away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge. | 23.45 | cum |
| 2 | Filling foundation trenches and plinth with fine river sand including watering ramming ect. including cost, conveyance, royalties, loading and unloading of all materials and all labour for work including scaffolding, watering and curing, sundries, T&P etc. complete as per the direction of the Engineer-in-charge. | 81.96 | cum |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2 inch) size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm (6 inch) thick to the required level ramming, watering and curing etc. complete including cost and conveyance of all materials with and royalties and all labour with T&P required for the work etc. complete including dewatering if required | 7.58 | cum |
| 4 | R.C.C. (M -20) using 20mm and 10mm size crusher broken Chips including cost, conveyance, royalty taxesof all materials, labour and T&P require for the work etc. complete with cost of centring & shutterign etc. complete including cost and conveyance of all materials with and royalties and all labour with T&P required for the work etc. complete including dewatering if required (a) Footing | 4.59 | cum |
| 5 | (b) Plinth Bend | 1.12 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054