- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of Jharkhand State Building Construction Corporation Limited
- >
NTID 43020519
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction And Renovation Wo in Ranchi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction And Renovation Wo" in Ranchi, India.
- Opening Date : Wed 31st December, 2025
- Closing Date : Tue 30th December, 2025
- ₹ 0.00
- NTID 43020519
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
9354000.00 -
Document Cost
10000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 1503 | Total Qty : 72622.94
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, levelling , ramming the foundation trenches, removing roots of trees, serbs all complete as per approved design,building specification & direction of E/I. | 21,315.37 | m3 |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/l (vide classification of soil item-B) hard soil @ 80% of tatal Excavation | 9,028.46 | CUM |
| 3 | ExcavationinOrdinaryRockwith Dozer with lead upto100metres(Excavation for roadway inordinary rock by deploying a dozer,80HP including cutting and pushing the cut earth to site of embankment up to a distance of 100 metres (averagelead50metres) ,trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 2,613.26 | CUM |
| 4 | Earth work in filling in sub floor trenches and plinth in layers not exceeding 150mm thick, well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within lead of 50m and lift of 1.5m all completed as per direction of the E/I (mode of measurement compacted volume). | 11,592.91 | Cum |
| 5 | Providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) Sand filling in Foundation, Flooring and Below Tai Beam | 2,213.10 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054