- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of PRADHAN MANTRI GRAM SADAK YOJANA
- >
NTID 43092688
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction And Maintenance O in Garhwa - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction And Maintenance O" in Garhwa, India.
- Opening Date : Mon 22nd December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 128466200.00
- NTID 43092688
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2577000.00 -
Document Cost
10000.00 -
Estimated Cost
128466200.00
BOQ Items Total Items : 298 | Total Qty : 222045.63
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Details | ||
| 2 | 1.L021-Bathan Toli To Kochli (Barkol Kalan) Setting out pillars providing and fixing of Benchpillars@ four nos. Per kmas per drawing given. ( size 1.00 x 0.345 x 0.345) | 3.400 | km |
| 3 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification . | 2.550 | Ha |
| 4 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 1785.000 | cum |
| 5 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 3873.600 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054