Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction And Maintenance O" in Garhwa, India.
- Opening Date : Mon 22nd December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 119503900.00
- NTID 43092686
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2399000.00 -
Document Cost
10000.00 -
Estimated Cost
119503900.00
BOQ Items Total Items : 288 | Total Qty : 200172.89
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Details | ||
| 2 | 1.L021-Kuswar To Sarkahi Main Road Setting out pillars providing and fixing of Benchpillars@ four nos. Per kmas per drawing given. ( size 1.00 x 0.345 x 0.345) | 1.000 | Km |
| 3 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification . | 0.600 | Ha |
| 4 | Dismantling of Cement Concrete Pavements as per Technical Specification clause 202. by mechanical means usingpneumatic tools breaking of pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000m, stacking serviceable and unserviceable materials separately. | 21.000 | cum |
| 5 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 675.000 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054