- Home
- >
- Tender
- >
- Andhra Pradesh Tender
- >
- Department of Archaeological Survey of India
- >
NTID 44553578
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConservation And Repairs To Bu in Amaravati - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Conservation And Repairs To Bu" in Amaravati, India.
Archaeological Survey of India
Amaravati, Andhra Pradesh, India
NTID 44553578
- Opening Date : Fri 10th April, 2026
- Closing Date : Thu 9th April, 2026
- ₹ 5034331.00
- NTID 44553578
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
125858.00 -
Document Cost
Refer Documents -
Estimated Cost
5034331.00
BOQ Items Total Items : 6 | Total Qty : 2524.56
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of brick work over stupa as a supportive wall in circular manner as a toe wall by Brick work with common burnt clay bricks etc., complete as directed by site-in-Charge. | 27.00 | Cu.m |
| 2 | Filling murrum over stupa top area to prevent the water stagnation includes cost of material and labour charges etc., complete as directed by the site in charge. | 340.31 | Cu.m |
| 3 | Removal of concrete layer over stupa includes cost of material and labour charges etc., complete as directed by the site in-charge. | 63.00 | Cu.m |
| 4 | Brick flooring over stupa with specially moulded bricks of size 38 x 30 x 8 cm in Lime Mortar and providing pointing to the joints in LM including cost and conveyance of all materials, labour charges, curing etc., complete as directed by the site in-charge. | 420.00 | Sq.m |
| 5 | Water tightening to top of stupa with brick jelly lime concrete (1 lime:2 Sand:4 brick aggregate of size 20mm) to an average depth of 15 cm with proper slope including ramming, consolidating, by using necessary adhesive materials etc., complete as directed by the site in-charge. | 154.25 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054