ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCivil Repair And Maintenance T in NANCOWRIE - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Civil Repair And Maintenance T" in NANCOWRIE, India.
Directorate General of Lighthouses and Lightships
NANCOWRIE, Andaman and Nicobar Islands, India
NTID 47224553
- Opening Date : Tue 10th November, 2026
- Closing Date : Mon 9th November, 2026
- ₹ 519134.00
- NTID 47224553
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
11810.00 -
Document Cost
Refer Documents -
Estimated Cost
519134.00
BOQ Items Total Items : 19 | Total Qty : 2443.01
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetaion,grass,brush wood , trees and sapling of girth up to 30cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared, including supply of labour, tools etc complete as directed engineer in charge. Including cost of all materials labour charges, minor tools & plants, cost of transportation charges upto worksite including overheads, additional labour charges for remote condition, loading & unloading, workmen insurance, safety equipment’s gadgets etc complete | 1231 | Sqm |
| 2 | Painting two coats over previously painted masonary tower and GI Trestle Lighthouse tower with 1st quality synthetic enamel paint as per existing bands of black & white,Handrailing ,Trap door , Alu.paint in stair of approved brand(Asian /Berger/ Dulux / Nerolac high glossy) to give an even shade and appyling primer wherever required and as directed at site after scrapping, brooming, sand papering, cleaning, including cost of labours, materials, tools, scaffolding etc. complete as directed by the engineer-in-charge. including cost of all materials labour charges, minor tools & plants, cost of transportation charges upto worksite including overheads, additional labour charges for remote condition, loading & unloading, workmen insurance, safety equipment’s gadgets etc complete | 306 | Sqm |
| 3 | Painting two coats on previously painted interior wall surface of lighthouse tower with interior acrylic emulsion paint (Asian/Berger) of approved brand and manufacture, to give an even shade scrapping, brooming, sand papering, cleaning,washing ,preparing the surface properly at all heights of lighthouse tower & then cleaning the cement, painting spots on the floors, doors & windows etc as directed including supply of all materials, labours, tools etc. complete as directed at site by the engineer in charge. including cost of all materials labour charges, minor tools & plants, cost of transportation charges upto worksite including overheads, additional labour charges for remote condition, loading & unloading, workmen insurance, safety equipment’s gadgets etc complete | 197 | Sqm |
| 4 | Finishing wall with 1st quality Premium Arylic Smooth Exterior Paint with Silicone additives of required shade (Asian /Berger) on old work (two or more coats applied@1.43ltr /10sqm) over existing cement paint surface at all height to give an even shade etc.wherever required including supply of all materials, labour, tools, scaffolding etc.complete as directed by the engineer in charge. Including cost of all materials labour charges, minor tools & plants, cost of transportation charges upto worksite including overheads, additional labour charges for remote condition, loading & unloading, workmen insurance, safety equipment’s gadgets etc complete | 65 | Sqm |
| 5 | Dismantling of wooden doors, windows and ventilators, clerestory windows (steel or wood) shutter including chowkhats,architrave, holdfasts etc, area not exceeding up to 3Sqm, without damaging the adjacent structure including stacking the serviceable material and disposal of unserviceable materials supply of all labours, tools, materials, etc. complete as directed by the engineer in charge. Including cost of all materials labour charges, minor tools & plants, cost of transportation charges upto worksite including overheads, additional labour charges for remote condition, loading & unloading, workmen insurance, safety equipment’s gadgets etc complete | 8 | No. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054