- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of Military Engineer Services
- >
NTID 47279165
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCa No Cwe hills pgh 109 Of in Pithoragarh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Ca No Cwe hills pgh 109 Of " in Pithoragarh, India.
Military Engineer Services
Pithoragarh, Uttarakhand, India
NTID 47279165
- Opening Date : Tue 24th November, 2026
- Closing Date : Tue 17th November, 2026
- ₹ 2615000.00
- NTID 47279165
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
52400.00 -
Document Cost
500.00 -
Estimated Cost
2615000.00
BOQ Items Total Items : 16 | Total Qty : 251
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supply ,installing ,testing and commissioning of energy efficient AC 3 phase 50 cycle per second 400 KVA capacity transformer copper wound ,step down, indoor type 11000/433 volts ( at on no load) confirming to IS 1180 (Part-I) level 3 ( as per latest energy level configuration level 3 now level 2 ), and BEE certified double wound oil immersed naturally cooled with internal cooling tubes delta connected on primary ( HV) side and star connected on secondary ( LV) side in accordance with vector symbol Dy-11 ( Vector group IV) with neutral brought on secondary ( LV ) side and having taping +/- 7.5% in step of 2.5% HV side to be varied by a manually operated “OFF LOAD” tap changing gear. The maximum temperature rise should not exceed 45 °C in oil and 55 °C in HV & LV winding when measured by the resistance method after continuous full load run and in ambient temp of 40 °C . including first filling of oil, all fitting and accessories and mounting all as specified. Inside of tank shall be painted with varnish or liquid resistant paint. For external surfaces one coat of thermo setting powder paint or one coat of epoxy primer followed by two coats of polyurethane base paint shall be used. IS: 1180 (Part 3) shall be referred to for paint thickness for normal to medium corrosive atmosphere. For highly polluted atmosphere and special application external paint work shall be as per direction of Engineer-in-Charge. Design ambient condition : a) air temperature 50 0C, b) Relative Humidity 90 % Max, c) Seismic Zone as per location of site, d) Altitude of Pithoragarh site. Noise level Shall not exceed limits as per NEMA TR-1 with all accessories running measured as per IEC 551 / NEMA standard. The transformer shall be IS : 1180 (PART-I) : 2014 (Fourth Revision) with latest amendments BIS certified (ISI mark) level 3 energy level configuration complete with all standard accessories complete all as specified and as directed.The transformer should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etc. Marking Each transformer shall be provided with rating plate made of anodized aluminium/ stainless steel material securely fixed on the outer body, easily accessible, as per IS: 1180 Part-3. The entries on the rating plate shall be indelibly marked. Fitting and Accessories The transformer shall be completed with standard fitting and mainly comprising the following :- Make : ABB/ Schneider/ ITE Gurgaon/ Voltamp or as approved by GE | 1 | Each |
| 2 | (a) One cable box on HV side (primary side) consist of 3 Nos porcelain bushing with studs made out of copper with nuts and washers and one cable glands suitable for reception of taking out one No 3 core HT cable of 95 Sqmm to 120 Sqmm size 11 KV grade PVC sheathed and PVC insulated armoured heavy duty. (b) One cable box on LV side ( secondary side) consist of 4 Nos porcelain bushing with studs made out of copper with nuts and washers and one cable glands suitable for reception of taking out one No 3.5 core LT cable upto 400 Sqmm 1100 volts grade PVC sheathed and PVC insulated armoured heavy duty. (c) Conservator with drain valve and oil level indicator. (d) Dehydrating breather with first fill of dehydrating agent silica gel. (e) Explosive vent. (f) Thermometer pocket on tank cover (g) One No 100 mm dia dial type thermometer vapour pressure type having range –120 degree C with more reading pointer maximum indicator and re-setting device (h) Rating plate with terminal marking (j) Two earthing terminal on tank and tank cover to facilitate fixing of 32x6 mm GI strips (k) Oil level gauge (l) Oil drain and filter valve (m) Lifting lugs/hooks (n) Oil filter hole with cap/plug with connection complete (o) Air relief valve plugs (p) Four plain solid cast steel detachable by directional rollers (q) Extra bushing ;for neutral out side the cable for providing independent earthing for neutral. (r) First filling fresh oil conforming to relevant IS and tested upto 50 KV dielectric strength | ||
| 3 | Supplying and laying synthetic Rubber insulated mats 2.5 mm thick for voltage upto 11 KV for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m complete all as specified and as directed. | 2 | Each |
| 4 | Supply and fabrication of rigidly welded construction 4 wheeled , 4 Ton Trailer ribbed bed mild steel trolley suitable for mounting transformer Step down outdoor type complete with standard fittings.The trolley should withstand field use and will not be adversely affected by mechanical hazards like bump shocks vibration etc complete all as specified and as directed.The Overall dimension of the 4 wheeled trailer is as under :- Length 4790 mm Width 2100 mm Height 910 mm + 25 mm from Ground Transformer & allied eqpts. The Trailer is designed to be towed by any load carrying vehicle.The trolley shall be completed with standard fitting and mainly comprising the following :- | 1 | Each |
| 5 | CHASSIS FRAME :- The chassis should be designed to accomadate 400 KVA step Down 11/433 KV Transformer & allied equipments. The frame shall const. of heavy rolled steel channels & pressed channels are sparingly used for cross members. The floor/Platform shall be of 6 mm thick steel sheets.The Trailer should have two axles of 63/50 square barand fitted with for wheels having pneumatic tyres. A rigid steel plate form along with four mudguard and supported on leaf spring suspension having 4 tonne capacity. A eyes hook is provided for coupling the trailer to the prime move vehicles stand 'T' reflector . |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054