- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Uttar Pradesh Projects Corporation Limited
- >
NTID 44565183
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBuilding Construction Work For in Bagpat - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Building Construction Work For" in Bagpat, India.
Uttar Pradesh Projects Corporation Limited
Bagpat, Uttar Pradesh, India
NTID 44565183
- Opening Date : Thu 2nd April, 2026
- Closing Date : Thu 2nd April, 2026
- ₹ 19825000.00
- NTID 44565183
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
397000.00 -
Document Cost
17700.00 -
Estimated Cost
19825000.00
BOQ Items Total Items : 157 | Total Qty : 32997.654
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge in foundation. | 627.930 | CUM |
| 2 | In all kind of soil upto 1.5m to 3.0m. depth | 17.520 | CUM |
| 3 | Filling of earth in plinth in 20cm layer including leveling, dressing and watering and also including of supply of earth including carted loading & unloading as per direction of Engineer incharge.. | 196.120 | CUM |
| 4 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | 86.847 | CUM |
| 5 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 155.840 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054