- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of National Hydroelectric Power Corporation Limited
- >
NTID 43084569
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBefore Road Tunnel On Tph Road in Chamba - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Before Road Tunnel On Tph Road" in Chamba, India.
National Hydroelectric Power Corporation Limited
Chamba, Himachal Pradesh, India
NTID 43084569
- Opening Date : Wed 24th December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 1235694.00
- NTID 43084569
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
25000.00 -
Document Cost
590.00 -
Estimated Cost
1235694.00
BOQ Items Total Items : 7 | Total Qty : 692.91
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means(Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of Soil. | 138.00 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand): 4 graded stone aggregate 40 mm nominal size). | 164.18 | Cum |
| 3 | Centering and Shuttering including propping etc and removal of form work for, Retaining wall, returns Wall, walls (any thickness) including attached pilasters buttresses, plinth and string courses fillets, kebs and steps etc. | 167.265 | Sqm |
| 4 | Providing and filling of Stone boulder behind Wall. | 76.59 | Cum |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 39.12 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054