- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Orai Development Authority
- >
NTID 43158344
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBeautification Work In Orai Ci in Orai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Beautification Work In Orai Ci" in Orai, India.
Orai Development Authority
Orai, Uttar Pradesh, India
NTID 43158344
- Opening Date : Wed 31st December, 2025
- Closing Date : Tue 30th December, 2025
- ₹ 5824468.00
- NTID 43158344
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
582447.00 -
Document Cost
1170.00 -
Estimated Cost
5824468.00
BOQ Items Total Items : 19 | Total Qty : 19131.67
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. DSR 2023- 2.31 | 7899.75 | sqm |
| 2 | Excavating, supplying and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR 2023- 2.5 (a) | 1573.35 | Cum |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering finishing and reinforcement - All work up to plinth level 1:1 :3 cement, coarse sand and 20mm gauge stone grit including all complete. DSR 2023- 5.1.2 | 89.25 | Cum |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D. DSR 2023- 5.22.6 | 7006.13 | kg |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.DSR 2023- 2.2.8. | 99.40 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054