- Home
- >
- Tender
- >
- Jammu and Kashmir Tender
- >
- Department of University Department
- >
NTID 47169575
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowBalance Works Of Construction in Jammu - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Balance Works Of Construction " in Jammu, India.
University Department
Jammu, Jammu and Kashmir, India
NTID 47169575
- Opening Date : Fri 6th November, 2026
- Closing Date : Wed 4th November, 2026
- ₹ 20099461.00
- NTID 47169575
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
401989.00 -
Document Cost
2360.00 -
Estimated Cost
20099461.00
BOQ Items Total Items : 135 | Total Qty : 44133.35
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:5:10 (1 cement : 5 coarse sand : 10 graded brick aggregate 40 mm nominal size) | 15 | Cum |
| 2 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. All work upto plinth level. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. | 1.5 | Cum |
| 3 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) | 1.5 | Cum |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete foundation and above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 325 | Kg. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform | 10 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054