Inquiry NowBalance Work Of Construction A in Azamgarh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Balance Work Of Construction A" in Azamgarh, India.
Uttar Pradesh State Bridge Corporation Limited
Azamgarh, Uttar Pradesh, India
NTID 43209759
- Opening Date : Fri 16th January, 2026
- Closing Date : Fri 16th January, 2026
- ₹ 208480539.00
- NTID 43209759
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2084805.00 -
Document Cost
11800.00 -
Estimated Cost
208480539.00
BOQ Items Total Items : 15 | Total Qty : 31484.36
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | PCC M15 Grade levelling course below approach slab complete as per drawing and Technical Specifications | 5.95 | Cum |
| 2 | Reinfoced cement concrete approach slab including reinforcement and form work complete as per drawing & technical specification. (M-30) | 17.85 | Cum |
| 3 | Furnishing and placing reinforced /prestressed cement concrete in superstructure as per drawing and Technical Specifications RCC M50 Grade with compaction and curing. Structural drawing Qty. will be measured only for payment purpose. The item includes all the following activities. MoRTH Specif. 1500, 1700 Sl. No. 14.1(G) above Ht. 10M (a) Development of land, casting yard establishment including design and fabrication of mould (3 set). Casting bed, gantry foundation, staking EOT gantry etc. with all materials, machine, concrete, labour, minor t&p, shuttering and centring, running and maintenance cost. (b) Providing and placing of reinforced/prestressed cement concrete in casting of segments in casting yard including centering and shuttering as per drawings and technical specifications including transportation of segments to launching point, its loading and unloading all the way to completion of work. (c) Providing and placing inserts in pier cap for placement of launching girder etc. completed. (d) Temporary column work on abutment cap, well cap for errection of launching of Girder with providing and placing work etc complete. (e) Temporary column work on abutment cap, well cap for dismantling work with providing and placing work etc complete. (f) Erection of launching girder including LG component, temporary stressing with all machines, minor t&p, material, supply of Knuckle assemblies, wire assemblies, macalloy bars, nuts, hydroullics, hoists etc complete which ever necessary. (g) The rate include all the cost of materials, major machinery, minor t&p manpower, consumable, POL, shuttering and centring, running and maintenance cost. 3.1 Casting of Segment including all materials, labour & T&P etc. | 717.17 | Cum |
| 4 | Excluding casting but including shifting, lauching and fixing/placing on the bearing (Bearing will be provided by the Department) | 7745.22 | Cum |
| 5 | Fixing of bearing and resting the segments of 3 span (Bearing will be provided by the Department) | 12 | No. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054