- Home
- >
- Tender
- >
- Haryana Tender
- >
- Department of Gurugram Metropolitan Development Authority
- >
NTID 45198086
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowAnnual Maintenance Of Storm Wa in Gurgaon - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Annual Maintenance Of Storm Wa" in Gurgaon, India.
- Opening Date : Fri 22nd May, 2026
- Closing Date : Fri 22nd May, 2026
- ₹ 29072937.00
- NTID 45198086
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
581460.00 -
Document Cost
5000.00 -
Estimated Cost
29072937.00
BOQ Items Total Items : 16 | Total Qty : 25973
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing and fixing of Pre-casted RCC cover slab minimum size 0.90 x 0.30 x 0.125 mtr with 4.24 kg steel bar of 12mm/10mm and 2 nos plastic bowls and iron hooks and side flat patti including labour carriage and material complete all respect. | 200 | Each |
| 2 | Providing Gunny Bags filled with Jamuna sand and sealing with machinery to be used at the required site as per situation and direction given by Engineer-In-Charge | 20000 | Each |
| 3 | Providing and fixing/construction of road gully with brick work, plaster, P.C.C, size 600x600x900 mm including excavation labour carriage and material complete in all respect. | 500 | Each |
| 4 | Providing labour/sewer man for day to day work required during flood season for removing of any blockage, removal of floating material (3 shifts per day) including Kassi Gati, Raincoat, Jecket with GMDA logo and all safety equipment. (A) 1 person per 2 km for upkeep of drainage network in a length of 78.709km 78.709 2=39 So, 39 persons are required per month (39 4 months = 156 nos) (B) Five supervisors will be provided with mobile phones and motorcycles, along with fuel and maintenance support, to oversee and monitor a total stretch of 78.709 km across Sectors 1 to 23. This arrangement is being implemented to ensure that maintenance-related issues are promptly and effectively addressed during the forthcoming rainy season. For 4 months x 5 nos = 20 nos Grand total = 156+20= 176 nos | 176 | Per Month |
| 5 | Day to day desilting work, survey by providing labour / sewer men including kassi, gaiti and all safety equipments complete in all respect. 9 Nos. Labour plus 1 No. supervisor per month for a total of 8 months after rainy season | 8 | Per Month |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054