Inquiry NowAnnual Maintenance And Special in Delhi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Annual Maintenance And Special" in Delhi, India.
- Opening Date : Tue 6th January, 2026
- Closing Date : Fri 2nd January, 2026
- ₹ 3677866.00
- NTID 43159743
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
73557.00 -
Document Cost
Refer Documents -
Estimated Cost
3677866.00
BOQ Items Total Items : 77 | Total Qty : 19772
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Servicing of 400/630/800 Amp., 11 KV OCB/VCB with blower, cleaning of existing HT panel inside,outside with tighting of all bus bar, nut & bolt, CT,PT chamber, alignment, adjustment of gaps between phase to phase, greasing & lubrication all moving fixed part including replacement of minor parts such as spring, washers etc for smooth mechanical operation i/c Servicing, Calibration, testing of 3 element IDMT relay ( one earth fault & two over current) with secondary injection testing of 11 KV OCB/VCB complete with testing commissioning as required. | 49.00 | Job |
| 2 | Removal of moisture in bus bar, insulator HT cable box and heating of P.T., C.T. Of 11 KV VCB/OCB Panel complete with High Pressure testing, Meggering of H.T. cable, Panel etc as required. | 5.00 | Job |
| 3 | Checking & arresting of oil leakages from 200 to 1600 KVA transformer at site including dismentling of LT/HT cables/ bus bar, connections, LT/HT bushing rods, dismentling of main top cover/inspection window of transformer after draining of oil of transformer in to drums, replacement of cork rings set along with new teflon rings of all phases for arresting oil leakage, fixing of all terminals & bus bar's connection and making adjustment, replacement of cork gaskets, oil rings of inspection window side & bukholz relay side & pipe line & Silica gel if any, re-filling of oil into transformer & High pressure testing & commissioning etc as required. | ||
| 4 | 1600 KVA | 2.00 | Job |
| 5 | 1000/1250 KVA | 2.00 | Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054