- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Public Works Region
- >
NTID 42654149
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowA Construction Of Pedestrian in Dhule - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "A Construction Of Pedestrian " in Dhule, India.
Public Works Region
Dhule, Maharashtra, India
NTID 42654149
- Opening Date : Mon 17th November, 2025
- Closing Date : Fri 14th November, 2025
- ₹ 109584798.00
- NTID 42654149
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
548000.00 -
Document Cost
3540.00 -
Estimated Cost
109584798.00
BOQ Items Total Items : 97 | Total Qty : 584646.3
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for foundation in hard rock by blasting including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed et-cetra complete. a) Upto 1.50 meter lift Normal Rate b) 1.50 meter to 3.00 meter lift, Add 10 percent c) 3.00 meter to 4.50 meter lift, Add 20 percent d) 4.50 meter to 6.0 meter lift, Add 30 percent. | 9900.000 | One Square Metre |
| 2 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed et-cetra complete. ( By Mechanical Means ) a) Upto 1.50 meter lift Normal Rate b) 1.50 meter to 3.00 meter lift, Add 10 percent. c) 3.00 meter to 4.50 meter lift, Add 20 percent d) 4.50 meter to 6.0 meter lift, Add 30 percent. | 24175.490 | One Cubic Metre |
| 3 | Excavation for foundation in soft rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed et-cetra complete. b) 1.50 meter to 3.00 meter lift, Add 10 percent | 109.120 | One Cubic Metre |
| 4 | c) 3.00 meter to 4.50 meter lift, Add 20 percent | 392.760 | One Cubic Metre |
| 5 | Excavation for foundation in hard rock by controlled blasting including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed et-cetra complete.b) 1.50 meter to 3.00 meter lift, Add 10 percent | 437.950 | One Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054